Project Nightingale

Project Details

Client: NHS / Mace

Products: Wall Modules

Project Overview

In response to the Covid-19 Pandemic and the urgent need for emergency healthcare, Excel Centre London was converted into a 4000 bed Intensive Care Unit with the project up and running within a few short weeks.

Supporting our National Health Service during a time of crisis, the need to reduce the number of site based operatives, deliver a fast track programme and abide by social distancing guidelines was paramount and aided by the use of Modular Engineering who delivered over two thousand pre-assembled bedhead units as part of a rolling 24-hour operation, including final installation on site.